Virtual fly over video of the E2 alternative.Virtual fly over video of the E1A alternative.Virtual fly over video of the E1 alternative.Virtual fly over video of the SR14 alternative.Virtual fly over video of the SR14A Preferred Alternative – Spanish.Virtual fly over video of the SR14A Preferred Alternative – English.All alignments south of the ANF will remain unchanged.Ī link to the PowerPoint presentation associated with this topic can be found here: PowerPoint: Palmdale to Burbank Amendment to the Preferred Alternative. The modified PA will avoid Una Lake and will be underground through the community of Acton, and within the Angeles National Forest (ANF) and the San Gabriel Mountains National Monument. The Preferred Alternative (PA) is now the SR14A alternative. A total of six alternatives were included in the environmental review, including the three original alternatives known as Refined SR14, E1 and E2, and the three modified alternatives known as SR14A, E1A and E2A. On September 2 ,2022, the California High-Speed Rail Authority (Authority) released the Draft Environmental Impact Report/ Environmental Impact Statement (Draft EIR/EIS) for the Palmdale to Burbank Project Section of the California High-Speed Rail Project for public review and comment under the California Environmental Quality Act (CEQA) and National Environmental Policy Act (NEPA). ![]() This project section will provide a critical link between the Bakersfield to Palmdale and the Burbank to Los Angeles Project Sections.Ĭlick here for additional information and resources for the Palmdale to Burbank Project Section. The Palmdale Station, and the alignment to Spruce Court in Palmdale, were evaluated as part of the Bakersfield to Palmdale Project Section, which was approved by the Authority Board in August 2021.The Burbank Airport Station was evaluated as part of the Burbank to Los Angeles Project Section, which was approved by the Authority Board in January 2022. ![]() This project section footprint spans from the southern portion of the City of Palmdale in the north, to Burbank in the south. ![]() This approximately 31 to 38-mile project section will connect two key population centers in Los Angeles County with multi-modal transportation hubs in Palmdale and Burbank. DRAGADOD has been awarded the 66 mile long segment from Fresno to Bakersfield.The Palmdale to Burbank Project Section is part of Phase 1 of the of the California High-Speed Rail System connecting the Antelope Valley to the San Fernando Valley, which will bring high-speed rail service to the urban Los Angeles area with a new modern rail line that dramatically reduces travel time between the Antelope Valley and the Los Angeles Basin. The first High Speed Rail of the United States, the California HSR System, from Los Angeles to San Francisco, is currently being implemented. It includes a 5-mile tunnel, El Pertús, that crosses the Pyrenees under the Spanish-French border. 450 milesĪmong the international HS projects carried out by DRAGADOS, we should mention the Figueras-Perpignan line that connects the Spanish High-Speed network with the French one.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |